Monday, October 10, 2016
En suite
Some time ago Ken and I decided to update our house and put an ensuite in. We were not going to do it straight away but do it when we were back next summer, however, our friend Bob talked us into doing it straight away and offered to project manage it. So far Kevin the plumber has run the pipe work in, Roland the builder has cut a new doorway into our bedroom and blocked up the door to the landing. Today Gary the plasterer has made a start on the plastering. Apart from the ensuite we are having the ceilings skimmed, wood paneling removed from the lounge and dining room walls, and all the rooms redecorated. Also a new fireplace and all new oak doors and oak floors. It will be a major renovation and bring the house up to date. After it is all finished I will have the front drive done and also renew the woodwork on the front of the house and replace it with plastic.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment